News

Filters
14 November, 2022

Closure of the drinking water main on Chemin Sainte-Marie and Boulevard Morgan

Category : Info-works

On November 14, the City of Montreal will begin work in connection with the REM. The work will take place on Chemin Sainte-Marie and Morgan Boulevard and will continue until November 28.

During this period, the work will require the closure of the main water supply line ( the 16-inch line). As a result, a pressure drop of 10 psi is expected on the entire Sainte-Anne-de-Bellevue drinking water network.

Water quality should not be affected by this situation. We will keep you informed if the situation changes.

Thank you for your understanding.