|
2026-08-07
|
|
|
2026-07-30
Notice of Construction on the North Service Road of the A-40 and Traffic DisruptionsHydro-Québec, in collaboration with its contractor GTEK, is currently carrying out work on the service road on both sides of the entrance located on Rue Frédéric-Back.
|
|
|
2026-07-30
|
|
|
2026-06-18
Repair work on the French drains and the outdoor fire protection system at the Laboratoire de santé publique du QuébecPlease note that due to unforeseen circumstances that arose during road cutting work, traffic adjustments are necessary at the Laboratoire de santé publique du Québec.
|
|
Info-collectes |
2025-12-15
Check the 2026 collection calendar |

.png)
